Ordering aluminum extrusions

MOQ / SAMPLES / DELIVERY

Get the same scope into every quotation.

A section photo is a starting reference. A purchase needs a controlled drawing, quantity units and agreed requirements for the finished part. This page explains the decisions to settle before an order; the written quotation defines the terms for your project.

Send your project brief

Alloy, finish or timing undecided? Describe the application and the question you need resolved.

Blue-finished machined square tubes
Authorized supplier listing photograph · machined tube reference. Order conditions require a project-specific quotation.
View this product reference

Order quantity

State pieces, total length or mass, plus the required cut length. Minimum order quantity is confirmed per project.

A repeat section and a new die can have different quotation requirements. Alloy, section geometry, cut length, finish and secondary operations also affect the proposed order scope. No catalog-wide minimum is published.

Include in the request

  • Quantity and its units
  • Finished length and any repeat demand
  • Existing section reference or controlled custom drawing

Sample arrangements

Ask whether a suitable reference or project sample can be supplied. Availability, charges and approval steps require confirmation.

A photograph or a reference piece cannot approve every requirement of a new part. If samples are agreed, record what they represent: section geometry, material condition, machining, finish or packaging. Agree the inspection criteria and any exclusions before release.

Include in the request

  • What the sample needs to establish
  • Drawing revision and finish reference
  • Approval method, requested documents and destination
Review tooling ownership and approval questions

Timing & delivery

Share the required arrival date and destination. Tooling, approvals, processing, packing and transport are reviewed separately.

Distinguish a requested arrival date from a proposed production or shipment date. The quotation should identify its starting conditions, approval dependencies and delivery scope. No fixed lead time, freight inclusion or arrival guarantee is assumed.

Include in the request

  • Requested arrival date and any flexibility
  • Destination and packaging or package-length limits
  • Named delivery term, named place and responsibilities to agree
Review packaging and receiving checks

FROM REQUEST TO RELEASE

Keep a record at each decision.

Tooling authorization, sample acceptance and production release serve different purposes. Make their conditions explicit.

  1. 01

    Prepare one reviewable brief

    Send the part or catalog reference, application, quantity units and current drawing revision. Mark requirements that are still open.

    Keep: A dated brief and the files it references

  2. 02

    Compare a defined quotation

    Resolve the proposed material, section, processing, finish, inspection, packaging and delivery scope. Identify exclusions and validity terms.

    Keep: A written quotation with clarified inclusions and exclusions

  3. 03

    Agree tooling and approval steps

    For new tooling, confirm ownership and revision terms. If project samples are agreed, define what needs approval before production.

    Keep: Tooling terms and the agreed sample or drawing acceptance record

  4. 04

    Authorize the agreed order

    Check that the order matches the accepted revision, quantity, finish, documents, packing and shipment terms. Resolve changes in writing.

    Keep: The order acknowledgment and controlled release documents

A USEFUL FIRST REQUEST

Send what is known. Flag what is open.

Add the part or catalog reference, drawing revision and units, quantity, cut length, intended application and destination. Include known material, machining, finish and inspection requirements.

For dimensions that control an assembly, mark the mating feature and acceptance requirement on the drawing. Request the documents you need before comparing prices.

Request a quote.

Please share your requirements and we’ll review your project.

Up to 3 PDF, DXF, STEP, PNG or JPEG files, 3 MB each. You can add files in more than one step.

Private storage; authenticated owner download only. Do not upload restricted technical data. Files are not automatically inspected for manufacturing suitability.

More project details (optional)

Leave anything undecided blank.

A failed or unconfirmed submission keeps this form intact. Retry without changing the request to safely reuse its submission ID.